Friday June 24, on the smaller Studio Earthship Build:
Here is a series of Photos selected over the course of the 5 week Earthship Build with Michael Reynolds, on the West Coast of BC. These photos show some of the Finished Details of the smaller Studio Earthship that was part of the two Earthships built on one site. Check out , ‘Time Lapse of the Finished Smaller Studio Earthship’, ‘Photos of the Finished Main House Eartship’ and ‘Time Lapse of the Earthship Build’ for more details of this Gulf Island build. Note: this is NOT our house, but a build we participated in.
Finished West Wing Can Wall of the Studio Earthship.
Next to the Kitchen sink (left) is the indoor Greywater floor Planter and closed Particulate Filter. The Kitchen (right) is in the process of clean up, but completed.
Finished cement floor in the pattern of a Sunrise in the main room next to kitchen.
The Studio Earthship Bathroom is cozy (left), and shows well the Bottle Wall (right) next to the Brown Coat Plaster finish over the ‘Battered’ Tire Wall beneath.
Studio Earthship Greenhouse Hallway with a view of the Light shining through the Bottle Wall at the East Entrance.
Landscaping outside the East Entrance of the Studio Earthship.
East Entrance of Studio Earthship with finished Wing Can Wall, Planters and Landscaping.
Image Credits: Monica Holy